The Mozzy

Home / Area 10 Crawl Space (Study 2nd Floor)

 Area 10 Crawl-space Study 2nd Floor

Crawl Space (Study 2nd Floor)

Area

10

  1. Cable and install 3 off External Bulkhead Light Fitting controlled from 2 off 1 Gang 2 Way Light Switch located at 2 off Crawl Space Entrance Hatch (Entrance hatches installed by KAK).